News:

Classified ads are not allowed on the forum.

Main Menu

dz 302 question

Started by dzstroker, May 24, 2007, 10:05:58 AM

Previous topic - Next topic

dzstroker

whats the shortest or longest time span between the casting date and the stamping date on a dz 302? I've seen some months and some days apart and was curious what is the correct time span. thanks Frank
1969 HUGGER ORANGE RS Z28 PROJECT

RamAirDave

The widest time span that I have personally seen was an 010 block E 22 9 casting with an original stamp V0729DZ.

I think that is not within the "norm", though.
"Build them how the designers and engineers envisioned them to be"

www.TheMuscleCarGuys.com

Jerry@CHP

Early production cars have a slightly wider span on casting dates vs assembly dates.  Closest I've seen and documented as real was one day.  That was on a 3rd quarter built Z28.

Jerry