Gentlemen,
Could a 1969 Z28 with a third week of January build date have an engine date of 1/16, or are those numbers too close together? Date on rear is 1/17.
Thank you
Works for Norwood, not Van Nuys. Norwood is a 5 hour drive from Flint, engines could be there same day.
01C final assembly @ NOR spanned 15 days. The date on the body tag is only a general indicator of final assembly.
Bill, you never disappoint. It is a Norwood car. Thanks very much for the reply.