Author Topic: VIN sequence is off by two weeks  (Read 16875 times)

nuch_ss396

  • Member
  • ***
  • Posts: 265
    • View Profile
VIN sequence is off by two weeks
« on: July 21, 2007, 11:27:41 PM »
I'm doing some VIN research to determine the build date of a car I'm considering.  I went to the archives ( here ) and got the "Ending VIN #" for the previous month,
then added the daily production rate ( per production day ) to work my way up to the VIN I'm researching.  Using the previously agreed to figure of 912 cars per day,
I come up with a build date that is two weeks later than the build date on the trim tag.  ???  Is this possible?

A couple issues need to be clarified:

1) If a build month ends on a Wednesday ( let's say April 30th, 1969 for this example ), that would be a 04E build date.  The following month starts on the next day,
    Thursday in this example.  Would Thursday & Friday count as 05A?  What if there was only one day ( Friday ) left in the week that starts the new month?  Does
     Friday count as 05A?

2) How accurate are the "Ending VIN" numbers GM supplied ( listed here )?

I had done a similar VIN research on my current SS and it worked out to late 10D, or possibly very early 10E - so my 10D trim tage code is very close.  As I mentioned
earlier, the potential car is off by two weeks ( later than the code on the trim tag ). 

Am I missing something here? ???  Or, is this within the acceptable tolerance for VIN research?

Steve
69 SS 396, Hugger Orange, D/80, D/90
Chambered Exhaust, N/66, THM400, 3:73 posi

Steve A.
  CRG

KurtS

  • CRG Coordinator
  • *****
  • Posts: 5884
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #1 on: July 22, 2007, 05:02:47 AM »
1. Build dates are approximates. Fisher had no reason to be rigorous about them.

2. The answer is right there in the monthly VIN listing that you referenced (http://www.camaros.org/geninfo.shtml#HowMany) :
Due to several limitations the VINs in this list will not necessarily correlate exactly with either a specific calendar day or the build week on the cowl tag. The list data for some months deviate significantly from actual build dates, while other months correlate well.

That needs to be bolded on the site too.....
Kurt S
CRG

nuch_ss396

  • Member
  • ***
  • Posts: 265
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #2 on: July 22, 2007, 06:02:57 AM »
Yeah Kurt, I saw that but sort of put it in the back of my mind for some unknown reason. ::)

On a somewhat similar note, why don't we have VIN vs. build date information for the LA built cars?

Steve
69 SS 396, Hugger Orange, D/80, D/90
Chambered Exhaust, N/66, THM400, 3:73 posi

Steve A.
  CRG

KurtS

  • CRG Coordinator
  • *****
  • Posts: 5884
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #3 on: July 23, 2007, 06:23:44 AM »
Umm, what column are you missing? :)
Kurt S
CRG

Mark

  • CRG Member
  • *****
  • Posts: 1089
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #4 on: July 23, 2007, 10:43:47 AM »

1) If a build month ends on a Wednesday ( let's say April 30th, 1969 for this example ), that would be a 04E build date.  The following month starts on the next day,  Thursday in this example.  Would Thursday & Friday count as 05A?  What if there was only one day ( Friday ) left in the week that starts the new month?  Does Friday count as 05A?

Steve

Typically, build weeks started on a Monday and remained the same all the way thru Friday(or Saturday if they were working).  So if the month ended on a Monday and it was an E week, the build dates stayed the same for that whole week.  The A week would start the following Monday which would be the 6th calenadar day of the month.
Mark C.
1969 Indy Pace Car
350/300HP RPO Z11

rare4k

  • Member
  • ***
  • Posts: 96
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #5 on: July 23, 2007, 04:01:33 PM »
I thought they worked on sat and sun? I have a 06B car with the mso sheet that has the car in the dealership on the 12th which is a monday in 67 the second week

Mark

  • CRG Member
  • *****
  • Posts: 1089
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #6 on: July 23, 2007, 04:23:02 PM »
For the most part production was 2 shifts a day, Monday thru Friday.  There may have been some Saturdays worked to clear backlogs, or when there were heavy orders, but they are pretty rare.  Don't think the plants ever worked a Sunday, as thats double time and a half OT.

Its more likely the dealership itself was not open on Sunday so they could not receive the car, or maybe thats just the way the delivery worked out.
Mark C.
1969 Indy Pace Car
350/300HP RPO Z11

rare4k

  • Member
  • ***
  • Posts: 96
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #7 on: July 23, 2007, 10:52:49 PM »
OK, now I'm lost here I have a 06B car which would to me would say the car was built the second week of june correct? the second week of june in 1967 starts on sunday the 11 and goes to saturday the 17 my SMO on the car is the 12th which is a MONDAY so explain it to me please thanks phil

Mark

  • CRG Member
  • *****
  • Posts: 1089
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #8 on: July 23, 2007, 11:07:56 PM »
Since theres an 06E week in June, one can surmise that 06A is May 29th thru June 2nd, 06B is June 5th thru June 9th.  OR this may be one of those odd months where the build week DID change when the calendar changed, ie 05E is May 29th thru the 31st and 06A is June 1st and 2nd.  Or maybe your car was pushed up in production a week after the tag had been issued, for some odd reason. The build weeks were not set in stone, sometimes they were shorter than a week sometimes they were longer than a week.
« Last Edit: July 23, 2007, 11:09:58 PM by Mark »
Mark C.
1969 Indy Pace Car
350/300HP RPO Z11

GaryL

  • Hero Member
  • *****
  • Posts: 538
  • Marilyn and me
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #9 on: July 24, 2007, 03:31:00 AM »
OK, now I'm lost here I have a 06B car which would to me would say the car was built the second week of june correct? the second week of june in 1967 starts on sunday the 11 and goes to saturday the 17 my SMO on the car is the 12th which is a MONDAY so explain it to me please thanks phil
Mark or Kurt will correct me if I am off base, but the "build date" is closer to when the car was entered into production than when it was finished (built).
Gary

Lemans Blue X33. DZ, M20, manual steering. Only BU code rear end is original.

nuch_ss396

  • Member
  • ***
  • Posts: 265
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #10 on: July 24, 2007, 08:47:05 AM »
Yes Gary,

But with 912 cars finished per day, how far can it possibly be off?

Steve
69 SS 396, Hugger Orange, D/80, D/90
Chambered Exhaust, N/66, THM400, 3:73 posi

Steve A.
  CRG

GaryL

  • Hero Member
  • *****
  • Posts: 538
  • Marilyn and me
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #11 on: July 24, 2007, 02:36:27 PM »
Yes Gary,

But with 912 cars finished per day, how far can it possibly be off?

Steve
My 02D car has a 9N613xxx VIN. The last recorded Febraury VIN is 607164. I am at least a full week into March. Quite a bit off I guess. If this is a high dollar car you are considering you should post specific numbers and pictures, then let the experts give you an opiniion.
Gary

Lemans Blue X33. DZ, M20, manual steering. Only BU code rear end is original.

JohnZ

  • CRG Member
  • *****
  • Posts: 4365
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #12 on: July 25, 2007, 01:08:09 AM »
Yes Gary,

But with 912 cars finished per day, how far can it possibly be off?

Steve

Minimum of two production days, possibly up to three between the body start date in the Body Shop and the time it came off the Chevrolet Final Line as a finished car.
'69 Z/28
Fathom Green
CRG

perryrj

  • Newbie
  • *
  • Posts: 10
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #13 on: July 25, 2007, 04:13:44 PM »
My car 9N638xxx has a 04L trim tag. Anyone have any thoughts on this? When was it built?

Jonesy

  • Member
  • ***
  • Posts: 456
  • 1969 Camaro z28
    • View Profile
Re: VIN sequence is off by two weeks
« Reply #14 on: July 25, 2007, 04:23:22 PM »
Most 4L tags are at the end of April. It may be they lost or broke the D and used the L instead. This has been noted on a number of late April cars.
1967 RS-Z/28 Nantucket Blue the D-2 car
1969 RS/SS 350 4 speed Azure Turquoise
1969 Z28 Azure Turquoise

 

anything