CRG Discussion Forum
Camaro Research Group Discussion => General Discussion => Topic started by: Ron C. on December 24, 2009, 12:57:02 AM
-
Just was wondering how long it would take a engine that was built at flint to get to the los assembly plant?
-
Just was wondering how long it would take a engine that was built at flint to get to the los assembly plant?
About 4-5 days.