3946
General Discussion / Re: 69 Z
« on: October 23, 2013, 07:23:42 PM »
Man I just looked at a calendar from 68. That would be awfully tight to near impossible I would think. 12-13-68 is a friday on the second week of the month. So they were able to produce the rear end on that friday and then run it over to the assembly line that same day for it to be installed in a car. It is not impossible but seems very improbable. IMO